Backup power
UPS runtime
Estimate UPS runtime from actual battery energy and load, with a check against its output power rating.
Your estimate
Updates as you typeEnergyCalcTools · Planning estimate · Review the assumptions below.
Estimated runtime
0.88h
- Estimated runtime
- 0.88 h
- Usable battery energy
- 162 Wh
- Battery-side power draw
- 183.47 W
- UPS load
- 25 %
Check the highlighted inputs to see a result.
An estimate based on your inputs. Example values are not current tariffs or equipment recommendations.
Use battery energy in Wh, not a VA rating. Check the manufacturer’s runtime curve for the actual UPS and load.
How it works
The energy model follows battery runtime, then compares connected load with the UPS continuous watt rating. Volt-amperes are not a measure of stored energy.
Hours = usable Wh ÷ (load W ÷ efficiency + extra standby W). Load % = load W ÷ rated W × 100.
Worked example
For 216 Wh, 75% usable capacity, 150 W load, 85% efficiency and 7 W extra draw, runtime is about 0.88 hours, or 53 minutes. A 600 W UPS is at 25% load.
What to keep in mind
- Enter the battery pack energy in Wh, not the UPS VA rating.
- Manufacturer runtime curves are preferable for final equipment selection, especially at high loads.
Reference sources
References explain the underlying concepts. The tool uses the simplified method stated above.